四川BBBB搡BBB搡B1图,120分钟婬片免费看,成人H动漫精品一区二区三区蘑菇

Strengthening

Location:Home>Strengthening

Structure monitoring system of Chongqing Nanji Gate rail bridge
2024-07-04 11:32:00

 Nanji Gate Rail Bridge is the first large-scale use of steel spring floating plate ballast in China. When the train passes over the bridge at high speed, the integral ballast of the steel spring floating plate can not only reduce the noise of the train, but also reduce the vibration of the bridge floor. The monitoring system monitors the vibration, main beam stress and environmental load of the bridge in real time.  


111.jpg 

Chongqing Nanji Gate rail bridge